Six EP jobs from the PAES Electrical unit. Each one mirrors the real workshop procedure: strip, loop, tighten, test, plug into the GFCI. Practice the cognitive parts before you touch real wire.
Strip the wires, loop them around the screws, tighten the plug. Test continuity.
Wire the socket to the EP1 cord. Screw in a bulb. Plug into the GFCI safely.
Red, white, black wires to FRONT, TRANS, REAR terminals. Continuity check, then ring.
Cable ripper, wire stripper, bend into loops. The cabling foundation for EP5 and EP6.
Run the wire through the box. Wire the switch. Wire the fixture. Test, then plug in.
EP5 plus a duplex receptacle. The most complex project. Multiple boxes, multiple terminals.